TABLE 2. Pertinent Information About the 18 New Candidate Sites (All Instrument Levels at 9.1 m, 30.5 m, and 45.7 m Unless Otherwise Noted)
Name of Site Utility Start of Measurements Status of Mesasurements, 1982
Big Sable Point, MI Consumers Power   January 1981   Continuing by utility
Bridger Butte, WY Intermountain Consumers Power   September 1980   Continuing by utility
Cape Blanco, OR Coos-Curry Electric   November 1980   Terminated October 1981
Diablo Dam, WA Seattle City Light   December 1980   Continuing by utility
Finley, ND Sheyenne Valley Electric Coop.   October 1980   Continuing by utility
Fort Sill, OK Department of Defense   September 1980   Terminated January 1982
Ilio Point, Molokai, HI Molokai Electric   January 1981   Continuing by utility
Kahua Ranch, Hawaii, HI Hawaiian Electric Light Company   February 1981   Continuing by utility
Kabuku, HI Hawaiian Electric Light Company   September 1980   Continuing by utility
Livingston, MT Montana Power   September 1980   Continuing by utility
Meade, KS City of Meade   July 1980   Continuing by utility
Minot, ND Verendrye Electric Coop.   October 1980   Continuing by utility
Nantucket, MA Nantucket Electric   November 1980   Terminated January 1982
Provincetown, MA(a) New Bedford Gas & Electric   January 1981   Continuing by utility
Romero Overlook, CA Department of Water Resources   October 1980   Continuing by utility
San Augustin Pass, NM E1 Paso Electric   November 1980   Continuing by utility
Stratton Mountain, VT Vermont Electric   January 1981   Terminated January 1982
Tucumcari, NM City of Tucumcari   November 1980   Continuing by utility
Wells, NV Wells Rural Electric   October 1980   Terminated January 1982


(a) Top level sensor is at 42.7 m.

NOTE: Two-minute instantaneous values of wind speed and direction recorded at all levels.